The Short Answer

A small repair reached from a ladder is a small bill. Anything that needs scaffold costs more, and the scaffold is often the biggest single line on it. A full strip and re roof of a typical house is a different order of job, priced by the roof area, the covering and what the timbers turn out to need. Everything between those two is decided by six things.

Scaffold or Ladder

A slipped tile on a bungalow can be a ladder job. Anything two storeys up, or anything taking more than a few minutes, needs scaffold for safety. On a small repair the scaffold can cost more than the roofing. That is why grouping repairs into one visit is worth doing, and why we will tell you if there is anything else worth fixing while the scaffold is up.

How Much Comes Off

Replacing a few tiles is a morning. Re bedding a ridge is a day. Stripping a slope back to the rafters, re felting, re battening and re covering is a week or more with a skip on the drive. The words "roof repair" cover all of them.

The Covering

Concrete interlocking tiles are the cheapest to buy and the quickest to lay. Clay plain tiles are smaller, so more of them, and take longer. Natural slate costs more again and takes skill to cut and fix. Reclaimed materials to match an old roof cost more than new because someone has to find them.

The Details That Take Time

Valleys, chimneys, dormers, hips and abutments are where a roof takes time. A plain rectangular roof with two slopes is quick. A roof with four chimneys, two valleys and a dormer is not, and most of the extra is lead, which is slow, careful work.

What Is Underneath

Rotten battens, perished felt, a rafter end that has gone. None of that shows from the ground and some of it does not show until the tiles are off. We photograph anything we find and price it before we carry on, never after, so there is no surprise at the end.

Whether It Can Wait

Making a roof safe at ten at night in the rain is a different job from a booked repair on a Tuesday, and it is priced as one. We will always tell you if it can safely wait until morning, and most things can.

What the Quote Looks Like

One written price, itemised: scaffold, materials, labour, disposal, lead, anything we already know about underneath. No obligation, no deposit to get it, and it stands. If we find something once the roof is open, you get a photograph and a price for that before we touch it.

Questions

The QuestionsPeople Ask First.

Anything not covered here, call 01372 540 258 and ask. You will get a roofer, not a call centre.

Why will you not give a price over the phone?

Because we would be guessing, and a wrong guess costs you either way. We can usually tell you from a photograph whether it is a small job or a big one, and the survey and written price are free.

Is the survey really free?

Yes, and so is the written quote. There is no obligation on either.

Do you charge a deposit?

Not for a quote. For the work itself we will agree the terms with you in writing before anything starts.

Can I get the scaffold cost down?

By doing everything that needs doing in one visit. If the chimney needs repointing and the ridge needs re bedding, one scaffold covers both. We will tell you what else we can see while we are up there.

Free survey and quote

Call Us, or Senda Photograph.

A picture from the ground is usually enough for us to tell you what we are looking at. The survey and the written quote are free, and there is no obligation on either.

Leatherhead
01372 540 258
Mobile, 24 hours
07513 397 799